Glass Bottle Soad Carbonated Drink Vodka Washing Filling Capping Machine
It's used to filling gas-contained liquid in glass bottle - special plastic ring pull aluminum cap, with bottle washing, filling, sealing parts.Widely used in every beverage factory.
Product Paramenters:
Automatic Glass Bottle Carbonated Drink Filling Machine for Cola,Soda Water etc
Main Technical parameters | |
Model | NPXGF18-18-6 |
Produciton capacity(330ml) | 3000-5000 |
Heads of Rinsing Filling & Capping | 18-18-6 |
Suitable bottle height (mm) | 160-340 |
Suitable bottle diameter (mm) | 50 ~ 100 |
Rinsing Water pressure (MPa) | 0.25 ~ 0.3 |
Filling way | Isobaric filling (twice vacuumized ) |
Filling temperature (℃) | 0~5 |
Filling pressure(MPa) | 0.15~ 0.5 |
Main motor power(kw) | 3 |
Total power(kw) | 3.18 |
Overall dimensions(mm) | 3012x2012x3260 |
Weight(kg) | 3800 |
Details of the Machine
- Glass bottle Separating..
- Energy saving. High efficient. Adapt to customer factory layout
- Special lubrication system, keep products clean, health, safety
- Extended service life
- Electric eyes design keep whole line running safety and quickly
- Overload protection mechanism to effectively ensure the safety of the machine
- Glass Bottle Washing.
- Into bottle way is air conveyor direct connection with bottle dial.
- All 304/316 stainless steel rinse heads, water spray style inject design, more save water consumption and more clean.
- 304/316 Stainless steel Gripper with plastic pad, ensure minimal bottle crash during washing.
- 304/316 stainless steel washing pump make the machine more durable.
- Glass Bottle Filling
- 304/316 Stainless steel high precision filling nozzle
- Filling volume adjustable in fine rank, same liquid level after filling
- All 304/316 stainless steel contact parts & liquid tank, fine polish, no death corner, easy to clean
- 304/316 stainless steel filling pump
- Efficient spray nozzle rinse thoroughly and save water for flushing
-Capping Part
The capping system applies advanced French technology,when clamp the cap will screw immediately and magnetic torque type capping head
1.installation&commissioning
After the equipment arrived at the customer's site. the customer is responsible for unpacking and arranging the equipment according to the placement drawing;Our technician will do equipment set up and commissioning,buyer should offer necessary help if needed
2.Quality assurance
The warranty period is 12 months after acceptance chech of the production line.if there is any different between the furnished equipment in the customer's factory and the equipment concerned in the contract.
3.Training
We are responsible for offering the technical training to user.Through training,users' technical staff can grasp and the skill of operation and maintenance proficiently.The buyer also can send staff to our company for learning.